Tonight after taking a shorter run I decided that I'd do some work on the basement floor.  This seemed like a great idea since I really hadn't done anything since Sunday, and Jasmine had been working on it through out the week.  So, after my dinner of left over Zingerman's sandwich from lunch, I headed down into the basement to get to work.  There are a lot of cut outs in the basement which is a real pain in the ass when dealing with floor.  I guess it probably wouldn't be as much of a problem if I had a saw for cutting something long and thin, but all I have is a miter saw and a jig saw, so it's not exactly fun.  That being said, I was able to get one of the small cut outs done pretty easily so that was a plus. 

After getting about three more layers into the floor I did a quick inspection and found that the floor had shifted a bit too far one way in a few spots so I needed to shift it back the other way.  Shouldn't be a big problem, and for the most part I was able to get it where it needed to be.  However, on the final board I was doing it resulted in pulling the row next to it out of place.  The result was a huge crack between the boards.  Normally shouldn't be a problem, however, the end that came out has a slanted edge so there was no way to bang it back into place.  So there it is, sitting there with a half inch crack.  After spending some time trying to figure out how to fix it, we gave up and faced the only solution. 

So, at 8:50, after about a week of work, we pulled the entire floor up to get to the third row of boards we put down so we could fix the giant crack.  In 15 minutes we undid hours of work because of that bitchy little shit of a crack.  In the words of someone, somewhere: horseshit.

Once the floor was back up we cleaned up the dust that was everywhere from the top of the boards and some of the bits that fell off as we removed it.  Took us about 30 minutes before we could really begin to work on putting the floors back in. The good news in all of this is that we had some issues when we put it in and there were some areas that weren't quite so tight.  After all this time working I learned a number of tricks and methods to fix that problem so all the planks we put back in are a lot better and tighter than the ones we originally put in.  In fact, the final product is a lot better than it was before we had to pull it all up.  So while it was really annoying, we were able to get about half of the floor back in before we stopped at 11:30.  That's not so bad for two hours, especially given that it was probably originally about 8 hours worth of work.  It does save a lot of time not having to cut and measure since that was already done.  So, hopefully tomorrow we can get it back to where it was originally, and then finish it up over the weekend.  I'm not looking forward to the door area, which is on an angle, or the weird little closet and cove area near the door which will be a lot of cutting.  But, it's about 40% done right now, and hopefully by tomorrow night we'll be back to the 75% done we were at.

Stupid cracks, runing everything causing us to redo it but in the end resulting in a better more finished project...  stupid.

Picture(s) of the Day:
Picture 247
Another picture that I snapped on Monday.  This was out the window at the league as it was raining.  The glass was really wavy and old looking, but none of that really came across in the photo except that it seems a little bit blurry.  Again, it's a lovely building.

2 comments:

Anonymous said...

I've seen the photos from instagram, looks like it was quite a job!!

Jason said...

It has had it's moment of difficulty. Especially some of the closet cut outs. I'm so glad that it's in now, all we have left is a little trim and some paint touch ups.