Wednesday, July 22, 2020

Rabbit Hole of a Big Fat Rabbit

July is the month of rabbit holes. Or perhaps it's better to call this project creep. Well perhaps not. Perhaps it's more of a planned rabbit hole. You see, back in March when this whole COVID nonsense started, we got some supplies before the lockdown so that we could do some cosmetic renovation to Jasmine's old room so that we could move Sal into it. It wasn't anything major, just paint and some boards to create the board and batten look in her new room. When we talked about moving her to a new room she insisted that the room had to look the same and since it's just paint and a few boards, it seemed like that could easily be arranged. Well, we finished it up and it looks pretty good, however, the carpet is not in great shape. It's the same carpet that we got about 11 years ago, and when we put it in we had to do the entire house so we got the cheapest possible carpet because at the time Becky had just started student teaching so she had no job, and I was about to start my student teaching. So the cost was a major concern, and as they say, "You get what you pay for." I don't think this carpet was designed to last for as long as it did. I mean, even the guest room looks horrible, and for the most part no one has really ever lived in there. Sean stayed in the room for a few months over a couple of years during school breaks, and we've had guests, but overall, I'd say that of the 11 years there has been less than one year of occupancy in that room. Theoretically, having only about a year's worth of wear and tear means that it should be in far better condition than it is. With that in mind, before Sal moves in I think we need to recarpet. We could move her in first, but we plan to consolidate her bedroom and playroom, and it seems to make more sense to carpet the room before there's so much shit to move. At the same time, the entire upstairs needs to be recarpeted as well. So, I figured if they're going to come for one, they might as well do the entire upstairs. But, if they're going to do the entire upstairs, then we probably should retile the bathroom floor, since the threshold will require some of the carpet getting pulled up, and it'd make more sense to do that before we get new carpet so that when they put the new carpet in it will be nice and finished instead of having to rip it up and trying to make it look good. So, we tore up the linoleum in that bathroom and put down some lovely tile. However, since we were putting in new tile, it made sense to pull out the vanity to tile the room, and it's a shitty ugly vanity with new drawers, so it made more sense to replace the vanity at the same time. However, because we were replacing the vanity with a lovely white vanity, the almond colored tub and toilet was really ugly. So, we pulled out the toilet (which we had to do anyway to tile) and decided to buy a new one, and we pulled out the tub surround (which was broken anyway) at the same time. The new tub was a real a-hole to get into the space, but eventually, we managed to get it in there. We haven't yet decided on a tile to put around the tub area, so the bathroom is partially done and there isn't a ton of work left to do before it's finished, just the wall tile and vanity which is a couple of days due to the need to wait between tile and grout etc. However, the bedroom door needed to be repainted, and the bathroom door needed to be replaced. Which then meant that the trim also needed to be repainted. Since that requires some precision painting, it seemed like we needed to paint the trim along the carpet before we get new carpet. So, I painted all the trim along the upstairs and then down the stairs. However, that required some repair on the wall, and so we had to do some touch up along the wall. Well, the paint doesn't quite match due to fading, so that means we might as well do the painting before we get new carpet so there's not accidental drips or spills. So now we have tested colors on teh hall wall, and picked a new color for the bedroom that is halfway finished in the bedroom. So, that's been what's been going on the past few weeks. One thing is leading to another and then another. It's starting to look really nice around the house, and I'm really loving the new colors we picked. They aren't terribly different from what we had before, just changes in tone and it just looks so much nicer than before. As it stands right now I have to finish the pain in our bedroom, finish the floor trim in the bedroom, paint the hall and foyer, paint the guest room, then get new carpet. We're moving right along, and it's probably the first major changes we've done to the house since we bought it. I guess this is what happens after 18 weeks of being stuck at home and not being able to go anywhere combines with no vacations for the foreseeable future.

No comments: